The challenge
Sprinkler design for high-bay racking and a future solar array both had to be accommodated in the initial power and roof loading strategy.
Our approach
We designed the distribution board schedule with spare capacity for a 1.2 MW PV array and coordinated ESFR sprinkler layouts against final racking heights.
Results
- Solar-ready infrastructure at 3% added cost
- Sprinkler scope approved by insurer first submission
- Estimate held within 4% at tender return