The challenge

The contractor needed a post-tensioned slab alternative evaluated without delaying the basement pour already underway.

Our approach

Our structural desk modelled both conventional RCC and PT slab schemes, compared tonnage and cycle time, then produced full bar bending schedules for the selected option floor by floor.

Results

  • Rebar tonnage reduced 9% against the tender design
  • Floor cycle shortened from 8 to 6 days
  • Zero RFIs raised on the issued shop drawings

Project gallery

22-Storey Mixed Use Tower — view 122-Storey Mixed Use Tower — view 222-Storey Mixed Use Tower — view 3

More projects

Precision Estimating

Ready to price your next project?

Send your drawings and receive a fixed fee and delivery date the same day.

99.8%
Accuracy Rate
24h
Turnaround